120 MW solar plant thermal inspection
Thermal scan of 248,000 modules at a 120 MW plant in Karapınar completed in three days.
View Details
Variable-rate application across 62 cooperative parcels in 14 days with 28% water saving.
In a high-pressure season for aphids and whitefly in Çukurova, the cooperative needed fast, simultaneous spraying. KT-40 and KT-20 aircraft worked in parallel.
Application logs were delivered to the cooperative with agronomist sign-off.
Thermal scan of 248,000 modules at a 120 MW plant in Karapınar completed in three days.
View DetailsOrthophoto, DTM and building vectors for an industrial-zone expansion; 2.4 cm horizontal RMSE.
View DetailsEleven bridge piers and two viaducts on the Bolu crossing inspected without rope access.
View DetailsShare the area, objective and timeline and an engineer will return within 24 hours with scope and pricing.