Viaduct and bridge inspection

Bolu

Viaduct and bridge inspection

Eleven bridge piers and two viaducts on the Bolu crossing inspected without rope access.

Setting up a rope crew for piers up to 60 metres tall would have taken months. With KR-6 Gözcü the surface was scanned in four days and crack and corrosion findings were mapped on the 3D model.

  • 212 crack records with width classification
  • 14 corrosion hotspots near bearings
  • Route saved for future periodic inspections

Diğer Reference Projects

Let’s turn your project into a flight plan

Share the area, objective and timeline and an engineer will return within 24 hours with scope and pricing.

WhatsApp +90 222 555 28 40 info@kartalay.com.tr